Global menu

Our global pages

Close
MENA update: Egypt FIT - further clarifications and UAE - DEWA roof top installations

MENA update: Egypt FIT - further clarifications and UAE - DEWA roof top installations

  • United Kingdom
  • Middle East
  • UAE
  • Africa
  • Energy and infrastructure - Clean energy

02-02-2015

Egypt FIT: Further clarifications and land coordinates

The Eversheds team has obtained further clarifications on the FIT programme. If you would like details please let us know.

The New & Renewable Energy Authority (NREA) has also made available the land coordinates and the solar and wind atlases. These are available for collection. If you need any assistance in obtaining these please let us know.

For further information on the Egyptian renewable energy programmes, please contact the team listed below.


UAE: DEWA releases technical standards for roof top installations

Dubai Electricity & Water Authority (DEWA) has launched a process of registration and certification in respect of solar equipment to be used as part of roof top installations in Dubai.

Manufacturers are required to register themselves and their products online with DEWA. As part of the process, an online application form must be completed and accreditation documents must be submitted. DEWA’s Standard for Distributed Renewable Resources Generators set out the requirements for photovoltaic modules, inverters, interface protection systems and other components.

The equipment that achieves certification will be listed on DEWA’s website after successfully completing the process.

We await further announcements from DEWA in relation to the roof top program, in particular the mechanism by which the net metering will operate and how excess generation will be dealt with. Eversheds will keep monitoring the situation and keep you up to date with future developments. 

Eversheds is MESIA MENA Law Firm of the Year 2014/15.

For more information contact

< Go back

Print Friendly and PDF
Subscribe to e-briefings